MUNICIPAL ROAD OVER SWIFT CURRENT CREEK

PROJECT OWNER: RM of Excelsior No.166
PROJECT LOCATION: Municipal Road over Swift Current Creek – 3.2km West of Waldeck
PROJECT SCHEDULE: July 2015 to August 2016
PROJECT VALUE: $576,852

Alberta Bridge Construction

PROJECT DESCRIPTION:

The scope of the project included the dismantling/removal of the existing low level creek crossing and the construction of a new two span bridge (total length of 30m) over the Swift Current Creek. The project also included raising the grade of the existing approach roadway approximately 4m and the realignment of the creek below the new bridge.