POND B INFILL – SUNCOR

PROJECT OWNER: Suncor Energy Inc.
PROJECT LOCATION: Ft. McMurray, AB – Suncor Base Plant
PROJECT SCHEDULE: August – September, 2010
PROJECT VALUE: $2,060,000

Suncor Pond B Project

PROJECT DESCRIPTION

This project was to accommodate infrastructure for the development of a Waste Water Treatment Plant. Due to limited space, the plant footprint was built within an existing containment pond. Dredging was required to remove soft material along the edge of the banks.